Monta Vista High School Projects

The Measure B Bond Program began with renovations of the fields and sports facilities at each of the five high schools along with an extensive solar energy project at each one of the District sites.  At Monta Vista High School, the following scopes of work were identified by the Program Implementation Plan (PIP) team as priorities to be completed during the Measure B Bond Program:

  • Build a new single story Classroom Building.
  • Expand and renovate the existing Kitchen and Cafeteria.
  • Repair/replace Rafter Tails and Re-Roof at various locations.
  • Repair aging infrastructure.

Since the time the PIP was first developed the Measure B Bond Program Management Team has received smaller than expected enrollment projections for Monta Vista High School.  Therefore, the original PIP identified projects have been augmented into the following Measure B Bond Program projects:

  • Demolish the existing Cafeteria Kitchen Building and Quad and build a new two-story Cafeteria Kitchen Classroom Building with (3) new classrooms.
  • Build a new Quad and Amphitheater as part of the new Cafeteria Kitchen Classroom Building.
  • Building B Restroom Renovations.
  • Various Roofing and Rafter Tail replacement projects.

The Measure B Bond Program work at Monta Vista High School is anticipated to be finished by the Summer of 2015.  For individual project status and updates please click on the project links below.

 

MVHS CKC 2.jpg


   Project Name: Cafeteria Kitchen Classroom Building
   Start Date: 4/3/2013
   Status: COMPLETE
   Completion Date:  5/2/2014
   Link to Project Detail
   Link to Time-Lapse Photos
  

  

 

MVHS Building B RR Renovations


   Project Name:  Building B Restroom Renovations
   Start Date:  6/28/2011
   Status:  COMPLETE
   Completion Date:  11/2011
   Link to Project Detail
 

 

 

 


   Project Name:  Roofing and Rafter Tail Repairs
   Start Date:  7/14/2011
   Status:  COMPLETE
   Completion Date:  1/2012
   Link to Project Detail
 

 

 

 

MVHS Track and Field


   Project Name:  Track and Fields
   Start Date:  9/2011
   Status:  COMPLETE
   Completion Date:  3/2013
  
 

 

MVHS Solar


   Project Name:  Solar
   Start Date:  6/2010
   Status:  COMPLETE
   Completion Date:  11/2010